Early entry and extension of installation time
Technical services - These are services for organizing connections to the engineering networks of the exhibition complex (electricity, water, sewage, compressed air), technical suspensions, loading and unloading operations, organizing access for additional installation time, and other services provided by the Technical Service of the "INNOPROM" exhibition - LLC "Technical Operator."

Early entry - This service provides the opportunity for earlier access to the exhibition complex territory for installation work than the official installation days. It is available for order in four-hour increments. (Exhibitors scheduled for loading and unloading operations on these days only pay for the loading and unloading operations without "Early Entry" and only perform unloading at the stand area without construction and carpet laying).

Night installation - This service provides the opportunity to extend the time for installation work in the evening and night hours beyond the official hours (from 08:00 to 20:00). It is available for order in increments of four and two hours.

All prices are inclusive of VAT.

The cost of services provided by the technical service of the INNOPROM exhibition
2024. Extension of installation time*
Note to p. 2001 – 2007
  • The technical possibility of early entry and night installation extension for each stand is determined individually by the manager, taking into account the "early entry schedule." The service is ordered through the Personal Account.
  • The cost-increasing service coefficients* are:
  • When ordered and fully paid for 19-14 (inclusive) days before the start of the exhibition – 1.5. For all services and rented equipment, except "Project-technical documentation control," "Supervision installation" (when ordered and fully paid for 19-14 (inclusive) days before the start of the exhibition – 2.0).
  • When ordered and fully paid for 13-02 (inclusive) days before the start of the exhibition – 2.0. For all services and rented equipment, except "Technical suspensions to roof trusses and rental of hanging equipment," "Static calculations," "Project-technical documentation control," "Supervision installation" (when ordered and fully paid for 13-02 (inclusive) days before the start of the exhibition – 2.5) and "Plumbing connections," "Compressed air connection" (starting from 13 (inclusive) days before the start of the exhibition, the service is not ordered).
  • Starting from 01 (inclusive) days before the start of the exhibition, technical services are not ordered. Note!
  • Coefficients are applied to the cost of the service and rented equipment.
Note! The cost is valid for the time periods when ordered and fully paid:
  • more than 20 (inclusive) days before the start of the exhibition
  • 19-14 (inclusive) days before the start of the exhibition
  • 13-2 (inclusive) days before the start of the exhibition